located in yanqing district, beijing, it is the first snowmobile and sled track in china, and the third track in asia and the 17th track in the world that meets the olympic competition standards. with a total length of 1,975 m, a maximum design speed of 134.4 km/h, and a vertical drop of over 121 m, the track is one of the newly-built competition venues with the highest design and construction difficulty, and the most complicated construction technology in the winter olympics.
contractor: shanghai baoye group corp., ltd.
participants: shanghai baoye metallurgical engineering co., ltd., shanghai baoye building decoration co., ltd., mcc (shanghai) steel structure technology corp., ltd.
cold-rolled work of baosteel zhanjiang steel's three-blast-furnace system project
the project is located in zhanjiang, guangdong province, with a construction area of about 130,000 square meters. it is the third cold rolling project following the 2030 mm and 1550 mm cold rolling of baosteel zhanjiang lron & steel co., ltd. it consists of cold pickling line, galvanizing line, annealing line, and auxiliary supporting facilities. the completion of the project has made zhanjiang lron & steel become the most advanced, efficient and competitive production base of million-ton ultrahigh-strength steel.
contractors: china mcc20 group corp., ltd., mcc5 group corporation limited (shanghai), and shanghai baoye group corp., ltd.
participant: shanghai mcc20 construction corp., ltd.
the phase ii one-step project of shougang jingtang united iron & steel co., ltd. − multi-mode full continuous casting and rolling production line
the project is located in tangshan, hebei province, with a construction area of about 80,000 square meters. it adopts the world's most advanced all-headless thin slab continuous casting and rolling process, and the product is positioned as "hot instead of cold" hot rolled ultra-thin steel coils. it is the first in the world to realize multiple rolling modes in the same production line, including single billet rolling mode, multi-roll rolling mode, and headless rolling mode, with the designed annual output of qualified finished steel coils of 2.1 million tons.
contractor: china mcc22 group corp., ltd.
universal beijing resort project (phase i)
the project is located in tongzhou district, beijing, and is the fifth universal studios theme park in the world and the third in asia. the park includes seven theme areas such as "transformers, kung fu panda, hollywood". theme area of "hollywood" and "transformer" are built and contracted respectively by mcc central research institute of building and construction and shanghai baoye. the "transformers" theme area consists of 11 individual buildings and outdoor landscapes, with a total construction area of about 20,000 square meters and a land area of about 60,000 square meters. the "hollywood" theme area has a total land area of 9.27 hectares, and a total construction area of about 34,000 square meters, with a total of 14 subprojects.
contractors: shanghai baoye group corp., ltd. and china jingye engineering co., ltd.
participants: shanghai baoye building decoration co., ltd., mcc (shanghai) steel structure technology corp., ltd., china mcc22 group corp., ltd.
new medical technology comprehensive building project (wuhan puren hospital)
the project is located in wuhan, hubei province, and is the only tier iii grade a hospital in qingshan district. with a total construction area of about 70,000 square meters, 26 floors above ground, and 3 floors underground, the project has greatly improved the medical conditions in qingshan district since it was put into use.the project continuously improves the sense of gain, well-being, and security of the old industrial workers; it also continuously enhances the people's livelihood and well-being index of old industrial bases.
contractor: china first metallurgical group co., ltd.
participant: wuhan mcc1 construction installation co., ltd.
sports park for chengdu world university games (dongan lake sports park, supporting hotels and gardens)
the project is located in chengdu, sichuan province, covering an area of 5,984 mu, mainly including landscape greening projects, water features, stadiums and supporting buildings. the park includes about 2.09 million square meters of greening projects, about 1.09 million square meters of water features, and 25 landscape bridges; the sports facilities include five buildings, including an open-air stadium, a multi-functional gymnasium, a small stadium, a swimming and diving hall, and a supporting hotel, with a total construction area of about 410,000 square meters.
contractor: china mcc5 group corp., ltd.
participants: chengdu surveying geotechnical research institute co., ltd. of mcc, china mcc5 group decoration engineering co., ltd.
tianjin juilliard school
the project is located in the binhai new area of tianjin, with a construction area of 45,000 square meters and a maximum building height of 38 meters. it consists of four individual buildings: a concert hall, a performance hall, a black box theater, and a rehearsal hall. the individual buildings are irregularly shaped and connected to each other by five large-span corridors. it is the first branch of the juilliard school, "harvard of music", outside the united states, as well as a powerful witness of cultural and artistic exchanges between china and the united states.
contractor: mcc tiangong group corporation limited
participant: tianjin mcc tiangong group corporation limited
national alpine skiing centre
the project is located in yanqing district, beijing. it has a total of 7 tracks, with a total length of 9.2 kilometers and a maximum vertical drop of 900 meters. it is the first competition venue with olympic standard alpine skiing track in china and one of the toughest competition venues in the world at present.
participant: shanghai baoye group corp., ltd.
chengdu tianfu international airport (t1 and t2 terminals, gtc area, parking building, and transit accommodation services for passengers)
the project is located in jianyang, chengdu, sichuan province, with a total land area of 52 square kilometers and a total investment of 69.263 billion yuan. by 2025, it is planned to meet the passenger throughput of 40 million passengers, the cargo and mail throughput of 700,000 tons, and the number of plane takeoffs and landings of 350,000. the project includes seven parts: flight area, terminal area, freight and maintenance engineering, airport production auxiliary facilities, fire rescue engineering, on-site public supporting facilities engineering, and on-site road traffic engineering.
participant: china mcc5 group corp., ltd.
building 1# and basement project of phase iii of nanjing international expo center
the project is located in nanjing, jiangsu province, with a total construction area of about 386,000 square meters. it is a comprehensive building integrating exhibition and conference functions, incorporating the latest exhibition concepts of the world and the regional characteristics of nanjing. it is majestic and grand in scale, and is one of the important buildings in the cbd central business district of hexi new city.
participant: mcc (shanghai) steel structure technology corp., ltd.
yiyang city "one park and two centers" ppp project − citizen service center
the project is located in yiyang, hunan province, with a total construction area of 52,000 square meters and a building height of 24.3 meters, with 5 floors above ground and 1 floor underground. it was designed by academician cui kai in combination with yiyang regional culture with the theme of dongting fisherman's songs. the facade of the building adopts stone curtain wall glass curtain wall metal grille curtain wall, making it a landmark building integrating science and leisure, cultural exhibition, sightseeing and tourism, and government services in yiyang.
contractor: mcc tiangong group corporation limited
quzhou sports park − stadium and ancillary facilities
the project is located in quzhou, zhejiang province, and serves as the main venue for the 4th sports congress in zhejiang province. with a construction area of 88,000 square meters and a building height of 45 meters, it has 4 floors above ground and 1 floor underground, with a seating capacity of 30,046 seats and fair-faced concrete expanded area of 140,000 square meters, which is the largest of its kind. it has successfully held multiple events such as the chinese athletics championships, grand prix, and star concerts. it has accommodated over 500,000 tourists, and has become a new venue for citizens' sports and a new landmark in quzhou city.
contractor: shanghai baoye group corp., ltd.
participant: shanghai baoye building decoration co., ltd.
annual production of 2.7 million tons of special steel by linyi iron and steel investment group special steel co., ltd. − iron-making, steel-making, and steel rolling
the project is located in linyi, shandong province, with an annual output of 2.31 million tons of molten iron, 2.7 million tons of molten steel, and 2.1 million tons of steel bars. it is the first domestic ultra-large-scale and long-process special steel project that built at one time. the project adopts more than 40 new processes and equipment, such as high-quality special steel continuous casting technology that has won the national science and technology progress award, to form a new demonstration of special steel production, and build a new benchmark of intelligent and efficient special steel base with reasonable layout, advanced equipment, ultra-low emissions, and intelligent and efficient.
contractors: mcc capital engineering & research incorporation limited, china mcc22 group corp., ltd., china first metallurgical group co., ltd., shanghai mcc20 construction corp., ltd.
participants: mcc tiangong group corporation limited, china metallurgical construction engineering group co., ltd., wuhan mcc1 steel structure co., ltd.
phase i project of 1.28 million tons per annum coking facilities upgrading and supporting coke-oven gas comprehensive utilization project of henan liyuan new energy technology co., ltd.
the project is located in anyang, henan province, and adopts the first set of stamp-charging coke oven with italian pw technology in china, with a 6.25-m high coking chamber and 2×60 holes. it is equipped with a cdq system, coal-repairing system, coke processing system, gas purification system and auxiliary facilities. the annual output of the project is 1.28 million tons of coke, 760 million cubic meters of coke oven gas, 80,000 tons of tar, 20,000 tons of crude benzene, and 17,000 tons of ammonium sulfate. with world-class innovative processes, intelligent construction, garden-style factories, and lean management, it has become an industry model of modern and green production in coking projects.
contractor: china mcc5 group corp., ltd.
participant: mcc5 group corporation limited (shanghai)
tianfu art park • wenbofang area venues construction project
the project is located in chengdu, sichuan province, and is an important supporting project of the 31st world university games. it is also a comprehensive urban cultural service facility integrating reading, exhibition, sharing, and communication functions, consisting of three individual buildings of the library, art museum, and art gallery, with a total construction area of 106,000 square meters. since the completion of the project, it has successfully held over thousand cultural events, such as "biennial exhibitions", making it an art expo resort for showcasing tianfu culture and experiencing world culture.
contractor: china mcc5 group corp., ltd.
participants: mcc5 group corporation limited (shanghai), china mcc5 group decoration engineering co., ltd., chengdu surveying geotechnical research institute co., ltd. of mcc.
pv silicon material manufacturing and technical innovation project of sichuan yongxiang new energy co., ltd. (phase ii high purity crystalline silicon project)
the project is located in leshan, sichuan province, covering an area of 177,000 square meters. it adopts the improved siemens method and the domestic independently developed cold-hydrogenation technology, reaching the international leading level. on november 30, 2021, the first batch of high-purity crystalline silicon products was successfully released, which was the largest single-set high-purity crystalline silicon production facility in china at that time. the purity of the products reached 99.999999999%, reaching the level of electronic grade silicon. it broke the long-term blockade of europe and the united states on china in the high-purity crystalline silicon technology, and realized the production of high-purity crystalline silicon in china.
contractor: china mcc5 group corp., ltd.
chuzhou olympic sports center
the project is located in chuzhou, anhui, and is the largest landmark building for sports and fitness in chuzhou city. it consists of a stadium, a swimming pool, a gymnasium, and outdoor supporting facilities, with a total construction area of 132,600 square meters. it can host national comprehensive sports games and individual international competitions, and meet the functional needs of nationwide fitness. the roofs of the two gymnasiums are connected smoothly and freely, like a graceful and elegant "splendid blue and white flower" blooming on the lakeside of minghu lake.
contractor: china mcc17 group co., ltd.
chongqing luoqi waste incineration power plant project
the project is located in yubei district, chongqing, with a construction scale of 3,000 tons of domestic waste per day and 667 million kwh of green electric energy per year. it is equipped with 4 mechanical grate incinerators of 750 tons per day and 2 condensing steam turbine generator sets of 45 mw. the completion of the project marks the comprehensive realization of the harmless, reduction, and resource utilization of chongqing's domestic waste. as a key livelihood and environmental protection project in chongqing, it plays a positive role in improving the infrastructure of waste disposal, environmental protection, energy-saving and power generation in the main urban area of chongqing, achieving good economic, social, and environmental benefits.
contractor: china metallurgical construction engineering group co., ltd.
reconstruction and expansion project of yulong copper mine of tibet yulong copper co., ltd. (18 million tons/year dressing plant project)
the project is located in changdu, tibet autonomous region, and is a key project in the non-ferrous metal industry planning of the ministry of industry and information technology of the people's republic of china. it is also the dressing plant with the highest altitude (4,637 meters). the project adopts the crushing-grinding process of semi-autogenous grinding ball milling rock crushing, with an annual production capacity of 1800 × 104 tons/year of copper ore powder and a daily processing capacity of 60,000 tons/day. since its operation, the production and operation of each system of the dressing plant have run smoothly and efficiently, greatly promoting the economic development of eastern tibet.
contractor: china mcc22 group corp., ltd.
participant: mcc22 group industrial technical service co., ltd.
phoenix hill sports park (football stadium and gymnasium)
the project is located in chengdu, sichuan province, and is an important venue for the 31st world university games. the project consists of a 60,000-seat professional football stadium, an 18,000-seat comprehensive gymnasium, supporting green areas, and commercial buildings, with a total construction area of about 456,000 square meters. the sports center can not only host international and domestic top-level events, but also meet the needs of professional training of youth football, as well as functions such as sports exchange, exhibition, commercial performance, large variety shows, and tourism.
participant: china mcc5 group corp., ltd.
yantai bajiaowan international convention and exhibition center project (convention and exhibition center, comprehensive cultural activity center, underground garage)
the project is located in yantai, shandong province, with a total area of 139,000 square meters and a total construction area of 200,000 square meters. it consists of a convention and exhibition center, a comprehensive cultural activity center, and an underground garage.
participant: mcc (shanghai) steel structure technology corp., ltd.
construction project of yangtze river international conference center
the project is located in nanjing, jiangsu province, covering an area of 87,000 square meters, with a total construction area of 186,300 square meters. the building has a height of 157 meters and is divided into four parts: convention and exhibition area, conference and banquet area, office area, and hotel.
participant: mcc (shanghai) steel structure technology corp., ltd.
phase i of luoyang olympic center
the project is located in luoyang, henan province, with a total construction area of 317,000 square meters, including a 60,000-seat stadium, a 2,000-seat swimming pool, and an athletic training gymnasium.
participant: mcc (shanghai) steel structure technology corp., ltd.
sanya sports center project (stadium)
the project is located in sanya, hainan province, with a total construction area of 86,000 square meters. the overall outer contour of the building is an irregular chamfered pentagon, making it a significant livelihood project and a new landmark building in sanya city.
participant: mcc (shanghai) steel structure technology corp., ltd.